Installation Guide

Pre-Installation

Before your premium stone surface can be installed, proper preparation is essential to ensure a smooth process and excellent results.

Site Preparation

  • Clear Access: Ensure clear pathways (minimum 80cm wide) from entrance to installation area
  • Clear Workspace: Remove all items from existing countertops and surrounding areas
  • Plumbing & Electrical: Disconnect plumbing and remove existing fixtures before our team arrives
  • Cabinets: All base cabinets must be permanently installed, level, and secure
  • Temperature: Maintain room temperature between 15-25°C for 24 hours before installation

What to Expect

  • We’ll contact you 1-2 days before installation to confirm timing
  • Installation typically occurs 7-14 working days after templating
  • Please ensure an adult (18+) is present throughout the installation process

Templating Process

Templating is a crucial step where we take precise measurements of your space to create a perfect fit.

The Templating Visit

  • Our specialist will visit your home to take detailed measurements
  • They will create templates that account for all angles, curves, and cutouts
  • This visit typically takes 1-2 hours depending on complexity
  • All cabinets must be permanently installed before templating

Important Decisions Before Templating

  • Sink selection and positioning
  • Tap model and placement
  • hob specifications
  • Edge profile selection
  • Splashback requirements
  • Drainage board grooves (if desired)

Installation Day

Timeline

  • Most installations are completed in a single day (4-8 hours)
  • Complex installations may require a second day
  • We’ll provide a specific timeframe for your project

What Our Team Will Do

  • Deliver your custom-cut stone surfaces
  • Carefully place and secure the material
  • Apply seams if multiple pieces are required
  • Cut out holes for sinks and taps
  • Seal edges between stone and walls

What to Expect

  • Some dust and noise is unavoidable despite our dust minimization efforts
  • Temporary disconnection of plumbing and electrical connections
  • Our team will wear protective footwear and use floor coverings when requested

Post-Installation

Initial Care

  • Avoid placing heavy items on newly installed surfaces for 24 hours
  • Do not clean with harsh chemicals for the first 48 hours
  • Light use can begin immediately, but allow adhesives to fully cure for 24 hours

Sealing Process

  • Granite surfaces will be sealed before installation
  • Initial sealing is included in your installation
  • We recommend resealing granite annually (quartz and Dekton do not require sealing)

Timeline for Full Use

  • Surfaces can be used for light activities immediately
  • Allow 24 hours before placing heavy appliances on surfaces
  • Plumbing can typically be reconnected 12 hours after installation

Quality Assurance

Our Inspection Process

  • Final inspection conducted with you present
  • We’ll check for any imperfections or issues
  • You’ll receive care and maintenance instructions

Warranty Activation

  • Your warranty begins on installation day
  • We’ll register your warranty automatically
  • Retain your invoice as proof of purchase

Follow-up

  • A team member will call 7-10 days after installation to ensure satisfaction
  • We’re available to answer any questions that arise post-installation

DIY vs. Professional Installation

Why Choose Professional Installation

  • Stone materials are extremely heavy and difficult to transport
  • Precise cutting requires specialized tools and expertise
  • Improper installation can lead to cracking, chipping, or uneven surfaces
  • Professional installation is covered by our comprehensive warranty

Warranty Considerations

  • Self-installation voids material warranty
  • Professional installation includes 2-year workmanship guarantee
  • Transportation damage is not covered for self-collected materials

Contact our helpful team via the Contact Us page, or call direct on 01432 355075 if you have any questions about the installation process.